How long does it take to install a swimming pool?

The installation time of a swimming pool depends on many factors, including the pool type, engineering work, foundation work, drainage requirements, and the building of necessary retaining walls and fences. Once we have visited your site, we can prepare an initial design concept and timeline, along with a budget range indication. 

Obtaining council consent will take some time as well, and this should be planned into the project timeframe. Our Zones Auckland pool builders are highly experienced in this area and can assist you with the compliance process. Generally speaking, every pool requires a building consent from Auckland Council. The only exceptions are spa pools or swim spas (under 5 square metres) with a lockable cover, and above-ground pools that are self-fencing and higher than 1.2 metres above ground. Explore our structured 5-step process to create your stress-free outdoor swimming pool.

Up Next

How much does a pergola cost in Hamilton?

Learn more

Why build an outdoor entertainment area?

Learn more

What pergola services do Zones® Landscaping provide?

Learn more

What types of outdoor entertainment areas do you specialise in?

Learn more

How much does it cost to build a deck in the Waikato region?

Learn more

What Swimming Pool Installation services does Zones® offer?

Learn more

What are some garden landscaping ideas?

1 Minute to Read

Learn more

What are popular outdoor room trends in New Zealand?

Learn more

What landscape design services do Zones Landscaping provide in West Auckland?

Learn more

What landscaping services do Zones Landscaping provide in Orewa?

Learn more