How long does it take to install a swimming pool?

The installation time of a swimming pool depends on many factors, including the pool type, engineering work, foundation work, drainage requirements, and the building of necessary retaining walls and fences. Once we have visited your site, we can prepare an initial design concept and timeline, along with a budget range indication. 

Obtaining council consent will take some time as well, and this should be planned into the project timeframe. Our Zones Auckland pool builders are highly experienced in this area and can assist you with the compliance process. Generally speaking, every pool requires a building consent from Auckland Council. The only exceptions are spa pools or swim spas (under 5 square metres) with a lockable cover, and above-ground pools that are self-fencing and higher than 1.2 metres above ground. Explore our structured 5-step process to create your stress-free outdoor swimming pool.

Up Next

Why choose Kate Ryan as your landscape designer in Auckland?

Learn more

What Paving services does Jagmohan Singh Offer at Zones® Landscaping Waikato & Hamilton?

Learn more

Saltwater or Chlorine?

Learn more

How much does it cost for pergola installation and design in Auckland Central?

Learn more

Why Choose Zones® Landscaping for Your Pool Project

Learn more

What landscaping designing services does Jagmohan Singh offer at Zones® Landscaping Waikato & Hamilton?

Learn more

What deck building services do Zones Landscaping provide in Hawke's Bay?

Learn more

What factors do I need to consider when planning an outdoor entertainment area in New Zealand?

2 minutes to read

Learn more

How Long Does it Take to Install a Swimming Pool?

Learn more

Why choose Monique Nielsen as your landscape designer in Auckland?

Learn more