How long does it take to install a swimming pool?

The installation time of a swimming pool depends on many factors, including the pool type, engineering work, foundation work, drainage requirements, and the building of necessary retaining walls and fences. Once we have visited your site, we can prepare an initial design concept and timeline, along with a budget range indication. 

Obtaining council consent will take some time as well, and this should be planned into the project timeframe. Our Zones Auckland pool builders are highly experienced in this area and can assist you with the compliance process. Generally speaking, every pool requires a building consent from Auckland Council. The only exceptions are spa pools or swim spas (under 5 square metres) with a lockable cover, and above-ground pools that are self-fencing and higher than 1.2 metres above ground. Explore our structured 5-step process to create your stress-free outdoor swimming pool.

Up Next

What can I expect from a landscape designer?

1 minute to read
Learn more

Why choose Monique Nielsen as your landscape designer in Auckland?

Learn more

What landscape design services does Zones provide in Auckland?

Learn more

Do I need a Permit to install a Swimming Pool in Hawke’s Bay?

Learn more

How Much Does a New Swimming Pool Cost in Hawke’s Bay?

Learn more

Does a Pergola Installation Require Building Consent from Auckland Council?

Learn more

Why choose Jagmohan Singh as your landscaping designer in Hamilton & Waikato?

Learn more

How do you design a landscape garden?

1 Minute to Read

Learn more

What is the best type of swimming pool?

Learn more

How much does it cost for pergola installation and design in Auckland Central?

Learn more