How long does it take to install a swimming pool?

The installation time of a swimming pool depends on many factors, including the pool type, engineering work, foundation work, drainage requirements, and the building of necessary retaining walls and fences. Once we have visited your site, we can prepare an initial design concept and timeline, along with a budget range indication. 

Obtaining council consent will take some time as well, and this should be planned into the project timeframe. Our Zones Auckland pool builders are highly experienced in this area and can assist you with the compliance process. Generally speaking, every pool requires a building consent from Auckland Council. The only exceptions are spa pools or swim spas (under 5 square metres) with a lockable cover, and above-ground pools that are self-fencing and higher than 1.2 metres above ground. Explore our structured 5-step process to create your stress-free outdoor swimming pool.

Up Next

Why Choose Zones® Landscaping for Your Pool Project

Learn more

What are the best materials for retaining walls?

Learn more

How much does a landscape designer cost?

1 Minute to Read

Learn more

Do I need a Permit to install a Swimming Pool in Hawke’s Bay?

Learn more

Why choose Thelma Meyer as your landscape designer in Auckland?

Learn more

How Much Does a New Swimming Pool Cost in Hawke’s Bay?

Learn more

Are Auckland homeowners still investing heavily in landscaping despite economic pressures?

1 Minute

Learn more

What are the steps involved in building an outdoor entertainment area?

3 minute to read

Learn more

What landscape design services do Zones Landscaping provide in West Auckland?

Learn more

Does a Pergola Installation Require Building Consent from Auckland Council?

Learn more